Case Studies
Completed electrical work in buildings across the South East, written up in full
Our case studies explain the work required, how we approached it and the completed installation. Offices, schools, churches, university buildings and industrial sites.
NICEIC approved contractor. SafeContractor accredited. DBS-checked engineers. Trading since 2008.
Recent work
Commercial Electrical Fit-Outs Across Three CEF Branches
Electrical fit-outs, LED and emergency lighting across three City Electrical Factors branches, coordinated with shopfitters and delivered ready for trading.
Venue Electrical Installation for a Lighting Truss
Electrical installation and power infrastructure for a structural lighting truss rated to 3,200kg per point at Fabric in London, delivered alongside our sister company OBAV.
Heated Pew Cushions at St Michael’s Church, Chart Sutton
Heated pew cushions installed at a working Kent church, warming the congregation rather than the whole building, with no fixings into the historic pews.
University of Sussex LED Lighting Upgrade
More than 1,500 LED luminaires installed across two floors of a Grade II* listed university library, on a 4am start, without the building closing for a day.
LV Switchboard Replacement Across Three University Buildings
Three main LV distribution panel replacements across a university campus, around £785,000 combined, each completed inside a four to six day shutdown on temporary generator supplies.
Complete Electrical Installation for Luxury Home
A complete electrical installation for a luxury refurbishment in Battle, from the full rewire through to Lutron lighting, Control4 infrastructure and EV charging.
Nightclub Lighting & Power Alterations at Fabric, London
Nightclub lighting and power alterations at Fabric, London, adapting the existing electrical installation as one of the club’s rooms was reworked into an atmospheric cave.
£1.2 Million Programme of School LED Lighting Upgrades
A £1.2 million programme of school LED lighting upgrades across 12 education sites, delivered on out of hours night shifts with no site closing at any point.