Electrical contractors in Maidstone
Lake Electrical offers EICRs and testing, LED lighting upgrades, church and hall heating, office fit-outs, main panels and full electrical installations for commercial buildings in Maidstone and the villages around it.
As electrical contractors in Maidstone, we have looked after St Michael’s Church in Chart Sutton, five miles south of the town, for several years, with a full rewire, LED lighting and heated pew cushions. We are NICEIC approved, SafeContractor accredited and have been trading since 2008.
DBS-checked engineers, NICEIC approved and SafeContractor accredited. Trading since 2008.
Offices, estates and business parks in Maidstone
Maidstone town centre is the largest office centre in Kent, so a good share of the work here is in office buildings, from single floors to whole blocks.
Around the town, the industrial and business sites each have their own character. Parkwood and Haslemere Industrial Estates and Penenden Heath Industrial Estate are established industrial areas. Eclipse Park and Turkey Mill are business parks with offices, and 2020 Business Park, near junction 5 of the M20, mixes industrial, office and distribution units. Kent Medical Campus is an Enterprise Zone set aside for healthcare and life sciences, and Aylesford Industrial Estate is about a mile from junction 6.
As electrical contractors in Maidstone, we carry out fit-outs, EICRs and LED upgrades in the town centre offices, and main panels, distribution, machinery supplies and high-bay lighting on the estates.
Rewire, LED and heated pews at St Michael’s, Chart Sutton
St Michael’s Church sits in Chart Sutton, a village in the borough about five miles south of Maidstone. We have looked after its electrics for several years, starting with a full rewire and LED lighting upgrade in 2019.
The church later asked us back to fit heated pew cushions for the colder months. They work like a heated car seat, warming the congregation rather than the roof, and they sit on the pews, so nothing was drilled into the historic woodwork. The church stayed open for services and events throughout, and the Parochial Church Council wrote afterwards to say it was “delighted with the results”.
EICRs that tell you something useful
Some testing is priced per circuit, with the engineer given around five minutes on each. That is not long enough to work out what a circuit feeds, so the report comes back full of limitations and you pay again for someone to investigate. We have seen a £500 report turn into a £10,000 remedial bill.
We give our engineers the time to understand what they are testing. Every EICR and fixed wire test is carried out to BS 7671, and the report sets out what needs fixing, how urgently, and what can wait for a later budget.
Offices, schools and industrial sites
For offices, we carry out Cat B fit-outs and refurbishments, with power and data to desks, floor boxes, lighting and distribution boards. For schools, we plan testing, rewires, lighting and heating around term dates, and every engineer is DBS checked.
On the industrial sites, shutdowns are planned around production. We also install data cabling, EV charging, standby generators and UPS systems.
Offices and commercial property · Schools and education · Industrial
Lighting and heating
LED upgrades start with a free survey. You see the cost, the yearly saving and the payback period before you decide, and on most commercial sites the money comes back through energy savings within five years.
For sports halls and other big rooms that are expensive to heat, we install electric radiant heating, after checking the building suits it. For churches, heated pew cushions are often the simplest answer.
Maidstone questions
Do you work outside the town centre?
Yes. We cover the estates at Parkwood, Haslemere and Penenden Heath, the business parks at Eclipse Park, Turkey Mill and 2020 Business Park, and sites out towards Aylesford.
Have you worked on churches near Maidstone?
Yes. We have looked after St Michael’s Church in Chart Sutton for several years, with a rewire, LED lighting and heated pew cushions.
Why do your EICRs take longer than some?
Because the engineer needs time to work out what each circuit feeds. A rushed test leaves limitations in the report, and you end up paying for someone to come back and investigate.
Do you take on larger homes?
Yes. We carry out full rewires, major renovations and high-end builds, though not small repairs.
Accredited contractor
NICEIC approval, SafeContractor accreditation and DBS checks on every engineer cover what schools, main contractors and commercial clients need to see before work starts.
Our wider coverage across the county is on our electrical contractors in Kent page. We also cover Tonbridge.
Recent projects
Get a quote in Maidstone
Send us a few details about the building and what you have in mind, along with any drawings or previous EICRs. If you need electrical contractors in Maidstone for testing, a lighting or heating upgrade or a full installation, we survey larger jobs before we price.
Ring 01732 758 985 between 8am and 5pm, Monday to Friday, or use the form.